Vartika Agarwal
Journal title : International Journal of Computing and Digital Systems
Publisher : Deanship of Scientific Research
Print ISSN : 2210-142X
Page Number : 1305-1314
Journal volume : 12
Journal issue : 1
0.9K Views Original Article
Various types of security attacks are normal in vehicular communication networks. The current study uses a support vector machine to implement a Point to Point Critical Path Monitoring (P2PCPM) based Denial of Service (DOS) Attack detection technique for Vehicular Communication Network (VCN) resource management. Greatest quality of P2PCPM is that it eliminates attacked nodes from the network for the smooth process of vehicular communication. This scheme works well in terms of accuracy as well as attack detection rate. The whole simulation is made and tried by utilizing MATLAB Software. Simulation result shows 99% accuracy in case of security attack detection as well as reduced training and testing error upto 2%. Experimental results indicate that this scheme has a great efficiency and works well up to 1000 nodes, which is the limitation of current implementation. In future, simulation test may be done for unlimited nodes using similar or other techniques of attack detection.
DOI : https://doi.org/10.12785/ijcds/1201105
Radio resource allocation in vcn is a challenging role in an intelligent transportation system due to traffic congestion. lot of time is wasted because of traffic congestion. due t...
Researchers have developed several authentication techniques for route predictions based on user requirements. these techniques estimate the shortest path and available resources i...
Internet of things describes the network of physical objects such as sensors, receivers, transmitters and other technologies which are used in vcn. in vehicular communication netwo...
Vehicle-to-vehicle (v2v) communication is an advance application and thrust area of research. in the current research, the authors highlighted the technologies which are used in v2...
Views: 2.8K
Views: 2.6K
Views: 2.6K